• >> Transformation in construction of Mr. Rossi in Treviso. (Pirini office- Italy 2010/11)
  • >> Modification in construction Headquarters of Doctors, Surgeons and Dentists in Treviso. (Pirini office- Italy 2010/11)
  • >> Modifications and accommodations external complex IPAB Turazza of Treviso. (Pirini office- Italy 2010/11)
  • >> Project with maximum elevation of the whole Church and Convent of Discalced Carmelites Scalzi, Parish of Gretta in Trieste. (Pirini office- Italy 2010/11)
  • >> Preparation of preliminary report for the initiation of the Strategic Environmental Assessment of the two interventions known tourist S. Bartholomew and Zindis in Muggia (Province of Trieste). (Pirini office- Italy 2010/11)
  • >> Sursock Residences Tower, 24 Floors RESIDENCES. Location: Ibrahim Sursock Residences Sursock Achrafiyeh, Beirut, Lebanon, 17400 m2. (MAN Enterprise S.A.L. –Lebanon 2010)
  • >> Sagesse Kindergarten: 6000 m2. Location: Ain Saadé Al Maten – Lebanon. Started as architect on the site and had the responsibilities of the Site Director. Worked on Finishing’s; Interior works, shop drawing, BOQ, direct relation with contractors. Exterior works; finishing, painting, cladding, roof. Also Urban Landscape works: excavation, roads, piling, gardens wall, side walk, greenery and fences. (MAN Enterprise S.A.L. –Lebanon 2010)
  •  

  • >> M.E.A. HEADQUARTERS (office building), location: Lebanon Airport, 4400 m2. (N&B. Nassar & Bouchi-lebanon 2009/10)
  • >> Jabal Omar development project in Makkah (General Contractor: Saudi Oger); Jabal Omar hotel towers (17 towers, each between 2100 and 9370 m2); 1-concept, 2-schematic design, 3-development design, 4-construction design, 5-shop drawing. (N&B. Nassar & Bouchi-lebanon 2009/10)
  • >> The Boulevard, Client: Abdali Boulevard Company, Jordan sixteen complex, each 7500 m2 (hotels, restaurant, malls), development design, shop drawing and tiling. (N&B. Nassar & Bouchi-lebanon 2009/10)
  •  

  • >> Sheraton Addis Hotel Addition. ( AAE. Associated Architects & Engineers-Lebanon 2007/8)
  • >> Villas Execution file. ( AAE. Associated Architects & Engineers-Lebanon 2007/8)
  • >> Mall Adid Ababa. ( AAE. Associated Architects & Engineers-Lebanon 2007/8)
  •  

  • >> Byblos Sud Village (Concept By Pierre El Khoury): six private villas, seven Residential Buildings, 30 keys SPA 5 star Hotel, 6000 m2 Beach facilities. (A et A Associated Architects & Engineers-Lebanon 2007/8)
  • >> Hotel Hilton / Beyrouth Bielle. (A et A Associated Architects & Engineers-Lebanon 2007/8)
  • >> Hospital: International Hospital Abou Dhabi. (A et A Associated Architects & Engineers-Lebanon 2007/8)
  • >> Resort & SPA / Ras Al Khaymeh. (A et A Associated Architects & Engineers-Lebanon 2007/8)
  • >> King Abdullah University of Science and Technology / Saudi Arabia execution. (Michel Abou jawed- Lebanon)
  •  

  • >> Apartment Chnaniir, Lebanon (Construction Documents). (Daz Architects, AA Studio-Lebanon 2006/7)
  • >> Sultanah Gallery / Riyadh, KSA (Conceptual Design). (Daz Architects, AA Studio-Lebanon 2006/7)
  • >> RMC Hospital / Riyadh, KSA (Conceptual Design). (Daz Architects, AA Studio-Lebanon 2006/7)
  • >> Health Clinic / Riyadh, KSA (Conceptual & Schematic design). (Daz Architects, AA Studio-Lebanon 2006/7)
  • >> Villa in Thoughar / Riyadh, KSA (Conceptual Design). (Daz Architects, AA Studio-Lebanon 2006/7)
  • >> Business Center / Jeddah, KSA (Conceptual Design). (Daz Architects, AA Studio-Lebanon 2006/7)
  •  

  • >> Offices for Pharma-Med. (Interior Design / Construction Documents). (Saab International- Lebanon)
  • >> Privat Villa (Construction Documents). (Saab International- Lebanon)
  •  

  • >> Mekhtar Residence. (Naji Eid-Lebanon 2005/6)
  • >> Bank Branches; Syria and Lebanon, plus Execution. (Naji Eid-Lebanon 2005/6)
  • >> Private Villa Montiverdi Execution phase. (Naji Eid-Lebanon 2005/6)

001

 

 

 

 

Sagesse1

 

 

sagesse3

 

 

gk